LOCATION:
Dolton, ILLINOIS
PROJECT DESCRIPTION:
Demolition, Excavation and Installation of IW Structures.
PROJECT TYPE:
INDUSTRIAL WASTE
COMPLETION DATE:
2018
Demolition of existing treatment plant and construction of new treatment plant facility. Excavation and installation of IW structures and piping, epoxy lining of structures, concrete foundations, PEMB system with finished office space, IW pumps and associated process piping systems, equipment including; OWS, overhead crane, (2) 30,000 gallon surge water tanks and (1) 10,000 gallon used oil tank, generator, ATU’s and all process control instrumentation.