UPRR Piper Bridge Relocation
Chicago, ILLINOIS
LOCATION:
Chicago, ILLINOIS
PROJECT DESCRIPTION:
Excavate and place two concrete pier caps, supply, erect and paint structural steel for addition to existing pipe bridge, abandon and relocate 150’ of 6” DF pipeline from underground to overhead on pipe bridge, pipe line continued into building navigated around existing structures to pipe trench tie in point.
PROJECT TYPE:
FUEL LINES
COMPLETION DATE:
2018
Muck out and clean 250’of pipe trench inside diesel shop building. Demo 6’’ DF pipeline and existing support columns, Excavate and place two concrete pier caps, supply, erect and paint structural steel for addition to existing pipe bridge, abandon and relocate 150’ of 6” DF pipeline from underground to overhead on pipe bridge, pipe line continued into building navigated around existing structures to pipe trench tie in point. Paint and label newly installed 6’’ DF line.